Situatia parcurilor eoliene pe judete

 

            Situatia
parcurilor eoliene pe judete

 

     1. Judet Constanta 

             Situatia parcurilor eoliene conectate la SEN la 31.07.2023
completata cu situatia APM

 

 

 

 

Nr.   SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Putere
(MW)

Data
CR.

Data  PIF

Act
APm

1

SC
MW TEAM INVEST SRL

Fantanele
Est

85

14.04.2008

PIF
2012  85 MW

Nu figureaza in lista

 APM

2

SC
TOMIS TEAM SRL

Fantanele
Vest

262.5

14.04.2008

PIF
2012  262.5 MW

Aut,nr.73/2011rev.

 

3

SC
OVIDIU DEVELOPMENT SRL

Cogealac

252.5

14.04.2008

PIF
2012  252.5 MW

Aut.nr.384/2012rev.

 

46

WIND
POWER

Limanu

8.5

18/2/2010

PIF
din 28.11.2014

Nu figureaza in lista APM

 

15

SC
CRUCEA WINDFARM SA
HIDROELECTRICA SA incepand cu 01.01.2023)

Crucea,
Vulturu si Pantelimon

108

12/20/2013

PIF
2014 108MW

Aut.nr.24/2020

 

16

RADRAMO
POWER SRL

Pestera
2

396

17.08.2021

PIF
31.12.2021

Aut.nr.24/2020

 

21

PNE
Wind Romania SRL

Poarta
Alba

115.6

10/14/2022

PIF
14.02.2022

Nu figureaza in lista APM

 

 

8

Total
Transelectrica

1399

 

 

 

9

WINDFARM
 SRL

Mihai
Viteazu

29.9

18/3/2009

PIF
nr.24/16.05.2012 – Etapa I-13.80 MW

Aut.nr.29/201rev.

 

10

NEG
PROJECT SRL

Pantelimon

1.6

06.03.2009

PIF
nr.103/12.07.2010

Aut.nr.130/2011rev.

 

11

Neg
Project Two (fost ROMWIND )

Pantelimon

2.4

12/3/2009

PIF
nr.109/12.07.2010

Aut.nr.205rev.

 

12

ROMWIND

Ciocarlia

4

12/3/2009

PIF
nr.21/15.01.2010

EIA23/2023

 

13

NEG
PROIECT 2

Mihai
Viteazu

2.4

12/3/2009

PIF
nr.39 / 26.03.2010

EIA23/2023

 

14

NEG
PROIECT 1

Mihai
Viteazu

3.2

12/3/2009

PIF
21/15.01.2010

Aut.nr.309/2020

 

21

ECO
POWER WIND

Mireasa

10

14/5/2009

 PIF nr. 150/10.11.2010

Aut.nr.513/2010

nerivizuita

 

22

WIND
STARS

Silistea

5

25/6/2009

PIF
105/12.07.2010

Aut.nr.202/2020

 

33

WIND
PARK INVEST

Pecineaga
2

6

5/11/2009

PIF
503/27.12.2012

Nu figureaza in lista APM

 

34

EDP
RENEWABLES (fost RENOVATIO POWER)

Pestera

90

19/11/2009

PIF
nr.25/31.05.2012

Aut.nr.73/2022

 

35

ELEKTRA
INVEST

Tortomanu
2 (Mircea Voda)

8

23/12/2009

PIF
din 29.09.2011

Aut.nr.425/2011rev.

 

36

EWIND

Pantelimonu(Crucea)

123

21/7/2010

PIF
din 01.03.2013

Aut.nr.7/2023

 

38

CERNAVODA
POWER

Cernavoda
1

69

27/11/2009

PIF  din 03.02.2011; 07.02.2011

SEA 13/2023

 

39

CERNAVODA
POWER

Cernavoda
2

69

4/12/2009

PIF  din 20.10.2011

SEA 14/2023

 

41

MIREASA
ENERGIES

Targusor(MIREASA)

50

8/12/2009

PIF
59/26.11.2014

SEA 14/2023

 

42

MONSSON
A.

Galbiori

5

4/2/2010

PIF
92/21.06.2010

Aut.nr.157/2013rev.

 

43

ELECTRA
WIND POWER

Tortomanu
3

8

15/2/2010

PIF
din 27.09.2012

Aut.nr.426/2012

nerevizuita

44

EOLIAN
PROJECT (pt 4.8 are PIF)

Pantelimon

7.5

18.03.2013

PIF
nr.429 din 06.09.2012 pt 4,8 MW

Aut.nr.134/2023

 

45

GENERAL
CONCRETE CERNAVODA SRL

Nicolae
Balcescu

10

2/3/2010

PIF
din 09.09.2013-Partial 10 MW din 28 MW

Aut.nr.93/2022

 

48

EOLICA
DOBROGEA ONE

Mihai
Viteazu

80

20/4/2010

PIF
28.12.2011

Aut.nr.330/2012/rev.

 

50

HORIA
GREEN (fosta RIG SERVICE)

Horia

7.5

7/6/2010

PIF
551 / 16.05.2013

Aut.nr.161/2018rev.

 

52

EP
WIND PROJECT (ROM) SIX

Chirnogeni

76

3/5/2010

pif
23.07.2014

Aut.nr.330/2012/rev.

 

53

EXTRAPOWER

Cobadin

50

22/7/2010

 20.10.2024

SEA19/2022

 

56

ROMCONSTRUCT
TOP

Silistea

25

11/12/2009

PIF
din 01.03.2011

Aut.nr.115/2011rev.

 

64

D.G.A.S.P.C.
CONSTANTA

CIA
Poarta Alba+CEEND Poarta Alba

0.2

11/11/2016

PIF
576/17.07.2013

Nu figureaza in lista APM

 

73

OMV
PETROM WIND POWER SRL (fost WIND POWER PARK)

Dorobantu

45

29.07.2009

PIF
din 01.03.2011

Nu figureaza in lista APM

 

75

COMUNA
CRUCEA

CEE
Crucea

0.2

21.02.2014

PIF
07.12.2015

Aut.nr.76/2017

 

76

COMUNA
ADAMCLISI

CEE
Adamclisi

0.2

21.02.2014

PIF
din 23.12.2015

Aut.nr.143/2017

 

77

COMUNA
GHINDARESTI

CEE
Ghindaresti

0.2

21.02.2014

pif
25.03.2016

Nu figureaza in lista APM

 

COMUNA
BARAGANU

CEE
Baraganu

0.2

14.04.2015

PIF
din 29.06.2016

Nu
figureaza in lista APM

 

84

WEP
TECHNOLOGY INVESTMENT SRL

CEE
Pecineaga II – 48 MW

48

12/4/2022

PIF
2024

SEA1/2020

 

85

EOLENERG
PROJECT SRL

CEE
Sacele 49,8 MW

49.8

8/7/2022

PIF 2025

EIA22/

 

86

TOTAL
NATURAL

Corbu

2.7

10/9/2012

PIF
784 / 24.11.2015

Aut.nr.250/2013rev.

 

87

SC
EVN WINDPOWER DEVELOPMENT & CONSTRUCTION SRL

CEE
Mircea Voda 

25.2

7/12/2022

13.05.2025

Nu
figureaza in lista APM

 

88

TOTAL
WIND POWER SRL

Centrala
Eoliana Mircea Voda

6

5/3/2023

03.09.2024

Nu
figureaza in lista APM

 

 

36

Total
Enel

878.9

  

 

 

44

Total
general

2.377

  

 

         

   

   In judetul
Constanta sunt 40 de parcuri eoliene existente puse in functiune cu o putere
totala de 2.377 MW,  din care 8 parcuri
mari cu  o putere de 1.399 MW conectate
de operatorul  Transelectrica  si 31 de parcuri cu o putere de 879 MW
conectate de operatorul ENEL Dobrogea. Mai exista 5 parcuri mici cu puteri de
0,2 MW

       – 6 parcuri
eoliene nu sunt prinse in situatia APM, insumand 260,5 MW nu apar in lista APM
posibil fara procedura de reglementare inceputa.

 

Nr.   SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Putere
(MW)

Data
CR.

Data  PIF

    
Act APM

1

SC
MW TEAM INVEST SRL

Fantanele
Est

85

14.04.2008

PIF
2012  85 MW

Nu
figureaza in situatia APM

21

PNE
Wind Romania SRL

Poarta
Alba

115.6

10/14/2022

PIF
14.02.2022

Nu
figureaza in lista APM

 

73

OMV
PETROM WIND POWER

Dorobantu

45

29.07.2009

PIF
din 01.03.2011

Nu
figureaza in lista APM

64

D.G.A.S.P.C.
CONSTANTA

CIA
Poarta Alba+CEEND Poarta Alba

0.2

11/11/2016

PIF
576/17.07.2013

Nu
figureaza in lista APM

 

77

COMUNA
GHINDARESTI

CEE
Ghindaresti

0.2

21.02.2014

pif
25.03.2016

Nu
figureaza in lista APM

 

46

WIND
POWER

Limanu

8.5

18/2/2010

PIF
din 28.11.2014

Nu
figureaza in lista APM

 

33

WIND
PARK INVEST

Pecineaga
2

6

5/11/2009

PIF
503/27.12.2012

Nu figureaza in lista APM

 

                                                                                                          260,5MW

     – 4 parcuri au
PIF in 2024,2025.din care pentru 2 parcuri 
racordate deja la SEN nu este inceputa procedera de reglementare.

Nr.   SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Putere
(MW)

Data
CR.

Data  PIF

Act
APm

87

SC
EVN WINDPOWER DEVELOPMENT & CONSTRUCTION SRL

CEE
Mircea Voda 

25.2

7/12/2022

13.05.2025

Nu
figureaza in lista APM

 

88

TOTAL
WIND POWER SRL

Centrala
Eoliana Mircea Voda

6

5/3/2023

03.09.2024

Nu
figureaza in lista APM

 

 

 

 

 

 

 

 

 

 

 

 

   -2 parcuri nu au
autorizatia de mediu prelungita.

 

Nr.  
SEN

Denumire investitor

Denumire centrale electrice eoliene

Putere
(MW)

Data CR.

Data 
PIF

Act APm

21

ECO POWER WIND

Mireasa

10

14/5/2009

 PIF
nr. 150/10.11.2010

Aut.nr.513/2010

nerivizuita

 

43

ELECTRA WIND POWER

Tortomanu 3

8

15/2/2010

PIF din 27.09.2012

Aut.nr.426/2012

Nerevizuita

 

 

 

 

 

 

 

 

 



Nr.   SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Putere
(MW)

Data
CR.

Data  PIF

Act APM

12

ROMWIND

Ciocarlia

4

12/3/2009

PIF
nr.21/15.01.2010

EIA23/2023

 

13

NEG
PROIECT 2

Mihai
Viteazu

2.4

12/3/2009

PIF
nr.39 / 26.03.2010

EIA23/2023

 

38

CERNAVODA
POWER

Cernavoda
1

69

27/11/2009

PIF  din 03.02.2011; 07.02.2011

SEA 13/2023

 

39

CERNAVODA
POWER

Cernavoda
2

69

4/12/2009

PIF  din 20.10.2011

SEA 14/2023

 

41

MIREASA
ENERGIES

Targusor(MIREASA)

50

8/12/2009

PIF
59/26.11.2014

SEA 14/2023

 

 

 

 



 

       In procedura SEA

     

 

Beneficiar

Denumire Plan

P(MW)

Data initiala

Etapa regl.

Nr./data

1

WEP Technology SRL

PUZ Parc eolian Pecineaga

 

 

Aviz Mediu

2/21.02.2020

2

VULTURU WIND FARM SRL

PUZ Parc eolian Vulturu Vest

 

 

Aviz Mediu

6/02.04.2021

3

CRUCEA POWER PARK SRL

PUZ Crucea Est ext SEA+EA

 

 

Aviz Mediu

7/25.06.2021

4

ENERGO WINDPROD SRL

PUZ Modif. Vulturu Nord

 

 

Aviz Mediu

13/24.09.2021

5

VULTURU POWER PARK SRL

PUZ Modif. Vulturu EST

 

 

Aviz Mediu

1/04.01.2022

6

FALCON WIND SRL

PUZ Parc CE 54MW Mereni +EA

 

 

Aviz Mediu

6/28.12.2022

7

CHEAP ENERGY COMPANY SRL

Construire Parc Pecineaga NE

 

 

Aviz Mediu

1/01.02.2023

8

WESTWIND MEDGIDIA SRL

PUZ Parc eolian ………….

 

 

Aviz Mediu

4/24.04.2023

9

ROMCIM SA

PUZ Parc eolian …..racord SEN

 

 

Aviz Mediu

5/15.11.2022

10

MONSSON ALMA SRL

PUZ  Parc eolian Galbiori

5

 

Incadrare finalizata

12991/2020

11

MONSSON TRADING SRL

PUZ Parc Silistea 3 Silistea

 

 

Incadrare finalizata

38/08.06.2021

12

MONSSON TRADING SRL

PUZ Parc Silistea 3 Crucea

 

 

Incadrare finalizata

39/08.06.2021

13

TOTAL WIND POWER/ ELEKTRA INVEST

PUZ Parc eolian +PV Cernavoda

 

 

Incadrare finalizata

2/11.01.2023

14

ELEKTRA POWER SRL

PUZ Parc eolian +PV Cernavoda

 

 

Incadrare finalizata

2/11.01.2023

15

VERONIKI WIND SRL

PUZ Parc eolian Silistea 4

 

 

Incadrare finalizata

3/11.01.2023

16

GREEN ENERGY DYNAMIC SRL

PUZ CE GOLD WIND Cobadin

 

 

Incadrare ……

 

17

PECINEAGA
ENERGIES SRL

PUZ
Modif. Comana Pecineaga

 

 

……

11/31.08.2021

18.

 

EOLICA DOBROGEA SRL

Complex energetic Cogealac

 

 

Solicitare memoriu

 

19

EOLICA DOBROGEA SRL

Complex energetic Cogealac

 

 

Solicitare memoriu

 

20

ENERGY STRIBOG SRL

PUZ CE ……………………..

 

 

Adr.ABADD

 

21

EOLICA DOBROGEA SRL

PUZ CE Integrat  Zona MK

 

 

Completari

 

22

EXTRAPOWER SRL

PUZ Parc eolian Cobadin

50

 

Dezbatere

 

23

EWE SIMINOC SRL

PUZ CE  Parc eolian
Siminoc

 

 

Decizie initiala

 

24

GREEN ENERGY DYNAMIC SRL

Construire CE Pietreni

 

 

PDV Memoriu

 

 

      

 

            In In procedura
EIA

    

 

Beneficiar

Denumire Plan

P(MW)

 

Etapa regl.

Nr. Doc

1

EVN WIND POWER DEV.SRL

Modif.Pr. Parc eolian M.Voda

 

 

Incadrare finalizata

214/08.06.2021

2

EVN WIND POWER DEV.SRL

 

 

 

Incadrare finalizata

213/08.06.2021

3

WEP TECHNOLOGY SRL

 

 

 

Incadrare finalizata

396/27.09.2021

4

WEP TECHNOLOGY SRL

Parc eolian Pecineaga

 

 

Anexa

10/24.04.2022

5

MONSSON ALMA SRL

Cap. CE parc eolian Galbiori

 

 

Incadrare finalizata

54/06.02.2023

6

ROMCIM SA

Drumuri parc eolian……..

 

 

Incadrare finalizata

95/08.03.2023

7

RADRAMO POWERSRL

Racord SEN Pestera 2  +EA

396

 

Incadrare finalizata

171/05.05.2023

8

VULTURU POWER

 PARK SRL

Parc eolian Vulturu Est

 

 

Dezbatere publica

      20.06,2023

9

ACTIV WIND SRL

Construire CE Medgidia

 

 

Memoriu CAT

 

10

ENERGO WINDPROD SRL

Parc eolian Vulturu Nord

 

 

Comunicare CAT

 

11

CRUCEA POWER

PARK SRL

Parc eolian Crucea Est

 

 

Memoriu CAT

 

12

CONSENWIND SA

Amenajare parc …………

342

 

Memoriu ANANP

 

13

MIDMAR CALLATIS SRL

Construire parc eolian Deleni

 

 

Memoriu ANANP

781.04.2023

14

VULTURU WIND FARM SRL

Parc eolian Vulturu Vest

 

 

Prezentare CAT

 

15

UNITED POWER

EOLIAN SRL

Drumuri parc eolian Baneasa

 

 

Dezbatere

 18.01.2024

 

UNITED POWER

EOLIAN SRL

Drumuri parc eolian Dobromir

 

 

Dezbatere

 18.01.2024

16

MONSSON ALMA SRL

Retehn.parc eolian Galbiori

 

 

Memoriu CAT

1075/20.06.2022

17

EOLENERG PROJECT SRL

Construire CE Sacele

 

 

Memoriu CAT

 

18

ACTIV WIND SRL

Construire CE Ciocarlia

 

 

Memoriu CAT

 

19

TOPALU POWER

 PARK SRL

Parc eolian Topalu

 

 

Decizie initiala

110/16.03.2023

20

MONSSON TRADING SRL

Parc eolian Silistea 3

 

 

Memoriu CAT

 

21

MONSSON TRADING SRL

Parc eolian Silistea 3

 

 

Memoriu CAT

 

22

ELEKTRA POWER SRL

Stocare CE

Cernavoda

 

 

Comunicare CAT

829/26.04.2023

23

TOTAL WIND POWER

SRL

Stocare CE

…………….

 

 

Comunicare CAT

693/05.04.2023

24

PECINEAGA ENERGIES SRL

Parc eolian ComanaPecineaga

 

 

Comunicare CAT

483/13.03.2023

25

FALCON WIND SRL

Parc eolian Mereni

54

 

Evaluare initiala

105/14.03.2023

26

ELEKTRA POWER SRL

Construire CE Cernavoda

 

 

Evaluare initiala

485/28.09.2021

27

ACTIV WIND SRL

Construire CE Pestera

 

 

Evaluare initiala

130/24.03.2023

28

DUNAREA POWER SRL

Construire CE………

 

 

Evaluare initiala

 

29

VERONIKI WIND SRL

Parc eolian Silistea 4

 

 

Evaluare initiala

161/04.04.2023

30

MONSSON ALMA SRL

Construire parc Deleni

 

 

Evaluare initiala

 

31

ELEKTRA INVEST SRL

Construire CE Mircea Voda

 

 

Completari

 

 

Total putere proiectata

……..

 

 

 

-5
parcuri eoliene conctate la SEN puse in functiune 2010-2014  au documentatile in curs de reglementare

 

  2. Judetul Tulcea

 

T1.

Situatie racordare SEN
actulizata 31.06.2023

 

Judet Tulcea

 

Nr.   crt

Nr.SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Puterea
aprobată
(MW)

Data
CR.

Data  PIF

    Autorizatie Mediu

 

1

4

LAND
POWER SRL

Dorobantu-Topolog

84

04.06.2010

PIF
2014 84MW

Aut.54/2020rev

 

2

5

SC
Verbund Wind Power Romania SRL

CEE
CAS SUD 2

75.9

04.06.2010

PIF
2013  75.9 MW

Aut.nr.58/2019

 

3

6

SC
Verbund Wind Power Romania SRL

 

69

6/4/2010

PIF
2013 69 MW

Aut.nr.59/2019

 

4

7

SC
Verbund Wind Power Romania SRL

CEE
Alpha Wind Nord

81.3

6/4/2010

PIF
2012 81,3 MW

Aut.nr.59/2019

 

 

 

Nr.parcuri  4

Total
Transelectrica

310.2

  

 

 

5

1

ELECTROGRUP

Valea
Nucarilor

0.75

 

PIF

Aut.nr.04/2022

 

6

2

GREEN
ENERGY GRUP

Valea
Nucarilor

0.75

 

PIF

Aut.nr.26/2021

 

7

3

BLUE
LINE IMPEX

Valea
Nucarilor

0.75

 

PIF

Aut.nr.04/2022

 

8

4

HOLROM
RENEWABLE ENERGY (fosta Pentium SRL)

CEEND
BAIA 2 MW

2

12/8/2006;
04/07/2015

PIF
88 / 20.03.2007

Aut.nr.46/2020

 

9

5

GREEN
ENERGY GRUP

Valea
Nucarilor

1.2

2/5/2009

PIF
297 / 16.04.2009

 

 

10

6

HYDRO
WIND POWER

Valea
Nucarilor

1.35

2/5/2009

PIF
296 /16.04.2009

Aut.nr.95/2021

 

11

7

ELECTRO
GRUP ENERGY

Valea
Nucarilor

1.95

2/5/2009

PIF
299 / 16.04.2009

 

 

12

8

ELECTRIC
PROD

Macin

1.6

6/2/2007

PIF

Aut.nr.138/2022

 

13

15

BLUE
LINE ENERGY

Valea
Nucarilor

1.7

5/2/2009

PIF
298 / 16.04.2009

Aut.nr.03/2022

 

14

16

EVIVA
Nalbant

Babadag
2

8.4

2/20/2009

PIF
100 / 29.07.2011

Aut.nr.8268/2011

 

15

17

ELECTRICOM

Casimcea
1

10

4/14/2009

PIF
nr.217083/15.06.2015

Aut.nr.159/2022

 

16

18

INTERTRANS
KARLA

Casimcea

5.8

4/27/2009

PIF

Aut.nr.02/2022

 

17

19

E.K.W.
ENERGY

Fagarasu
Nou

6.69

22/4/2009

PIF
nr.5621/26.08.2010- partial pt 0.69

Aut.nr.96/2021

 

18

20

LIGHT
ENERGY

Nalbant

0.6

4/22/2009

PIF
nr.885/30.09.2009

Aut.nr.47/2020

 

19

23

HOLROM
RENEWABLE ENERGY

Baia
2

5

7/5/2009

PIF
nr.133/16.12.2010

Aut.nr.46/2020

 

20

24

ENEL
GREEN POWER ROMANIA SRL ( fost ) BLUE ENERGY

Corugea-Cismeaua
Noua

70

17.07.2009

PIF
nr.1/20.01.2012

Aut.nr.30/2022

 

21

25

ENEL
GREEN POWER fost BLUE LINE VALEA 
NUCARILOR

Salbatica
2

70

17/7/2009

31.12.2021
conform AA 12 pentru solutia definitiva (PIF 159 / 28.12.2011 pe solutie
alternativa)

Aut.nr.13/2022

 

22

26

ENEL
GREEN POWER ROMANIA

Salbatica
1

70

17/7/2009

31.12.2021
conform AA 10 pentru solutia definitiva (PIF 113 / 19.09.2011 pentu solutia
alternativa)

Aut.8295/2020rev

 

23

27

Blue
Line Power SRL (fosta BLUE LINE ENERGY)

Agighiol-Valea
Nucarilor

35

17/7/2009

etapa
I-9 MW 31.12.2017 si etapa II 35 MW-31.12.2019 cf AA 7

Aut.nr.75/2020

 

24

28

EDP
Renewables Romania (fost  RENOVATIO
POWER )

Sarichioi

33

14/7/2009

PV
– / 2011
PV PIF 3/06.03.2012

Aut.nr.09/2022

 

25

29

EVIVA
Nalbant

Babadag
1

33.6

3/8/2009

PV
– / 2012
PV PIF 17/10.04.2012

Aut.8268/2020rev

 

26

30

HOLROM
RENEWABLE ENERGY

Baia
3

10

14/7/2009

PIF
nr.86/20.06.2011

Aut.nr.141.2021

 

27

31

Enel
Green Power Romania (fost TOTAL ELECTRIC)

Topolog

27

14/7/2009

PV
PIF 80/12.12.2012

Aut.nr.24.2023

 

28

32

EOL
ENERGY MOLDOVA

Mahmudia

4

15/10/2009

PIF
23/16.07.2012

Aut.nr.84/2022

 

29

37

BLUE
PLANET INVESTMENTS

Baia

10

24/11/2009

PIF
105/04.08.2011-partial pt 10 MW

 

 

30

40

BLUE
LINE ENERGY

Caierac

6.15

6/12/2009

PIF
241374/22.11.2013

Aut.nr.

 

31

47

ECOENERGIA

Stejaru

34

17/3/2010

PIF
nr.86/21.11.2013

Aut.nr.36/2018

 

32

51

ENERGIA
VERDE VENTUNO

Cerna

17.5

15/7/2010

PIF
29/17.06.2014

Aut.nr.88/2022

 

33

54

ENEX

Nalbant

27.5

21/9/2010

PIF
26/27.05.2014

Aut.nr.49/2020

 

34

55

ENEL
GREEN POWER ROMANIA

Agighiol-Valea
Nucarilor

34

7/17/2009

PIF
113 / 19.09.2011

Aut.75/2020x

 

35

57

SC
DAK ANYA CRIS  SRL (fost PROMT ENERGY)

Dealu
Redi

5

24.11.2010

PIF
2053 / 31.08.2020 – etapa 1

Aut.1102023rev

 

36

59

EOL
ENERGY SRL

Mihai
Bravu

6

30.11.2011

PIF
nr.203648/06.02.2014

 

 

37

60

EOLIAN
GENERATOR (PIF CEE 2 MW)

Somova

2

16.03.2012

PIF
nr.243419/09.12.2013-partial pt 2 MW

Aut.nr.23/2019

 

38

63

BLUE
LINE ENERGY SRL

Bestepe

4.1

19.04.2012

PIF
nr.237446/16.12.2015-partial etapa I

Aut.nr.39/2019

 

39

65

EOLIENE
VERZI SRL

Atmagea

4

8/6/2012

31.12.2021
CF AA7

Aut.nr

 

40

74

BELA
CONSTRUCT SRL

CEE
Valea Teilor

2,6

24.06.2013

PIF
1575 / 26.03.2019

Aut.nr.139/2022

 

41

79

XAB
PARK SRL

CEE
Mahmudia

1.372

5/9/2016

PIF
28.12.2020

Aut.nr

 

42

80

ACASAM
ENERGY SRL

CEE
Nalbant 2

0.87

11/2/2016

PIF
nr.212846/10.05.2017

Aut.nr.75/2022

 

43

81

VOLTAIC
AVANGARD SRL

CEE
Nalbant 3

0.87

08/17/2016

PIF
237862/12/08/2016

Aut.nr.76/2022

 

44

89

ECOPROD
ENERGY SRL

CEE
Topolog

0.66

 

 

 

 

 

 

Nr.parcuri  39

Total
Enel Dobrogea

555

    

 

 

Nr.
Parcuri 43

Total
general

865,2

    

  

 

 

 

 

T2.

Situatii documentatii
parcuri eoliene in curs de reglementare

 

Nr.   crt

Nr.SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Puterea
aprobată
(MW)

Data CR

Data  PIF

Data
incepere procedura reglementare

1

8

SC
Verbund Wind Power Romania SRL

Alpha
Sud-1

57

 

PIF
2024 57 MW

 

2

9

BETA
WIND SRL

Casimcea,
Daeni, Topolog

151

 

PIF
2025 50 MW, 2026 50 MW,                             PIF 2027 51 MW

 

3

13

SC
ENERGIA MILENIULUI III SRL

Casimcea

99

 

PIF
2024 99 MW

 

4

22

The
Way of Energy SRL

Beidaud
1

115.48

 

4/26/2026

 

5

23

Solar
Eol Volt SRL

Beidaud
2

66.09

 

4/26/2026

 

6

24

Sun
Eolspace SRL

Beidaud
3

53.75

 

4/26/2026

 

7

25

Baronway
Energy SRL

Stejaru

61.98

 

4/26/2026

 

8

29

Big
Mega Vacareni Wind Farm SRL

Vacareni

87.475

 

12/31/2025

 

 

 

Nr. Socumentatii  8

 

691.775

 

 

 

 

3. Judet Galati

 

Situatie racordare la
SEN la 30.06.2023

 

Judet Galati

 

Nr.   crt

Nr.SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Puterea
aprobată
(MW)

Data
CR.

Data  PIF

Act APM

1

31

Green
Labs Advertising SRL

Poiana

150.5

C661/2023

12/31/2026

 

 

 

1

Total Transelectrica

190.5

  

 

1

1

SC
CORNI EOLIAN SRL

Corni

70

R122/2009

PIF

 

2

2

SC
Bridgeconstruct SRL Iasi

Cudalbi

10

R184/2009

PIF

 

3

5

SC
DAN Holding MGM SRL

Pechea

6

R657/2009

PIF

 

4

6

SC
Smart Clean Power SRL

Schela

8

R655/2009

PIF

 

5

9

SC
GRENERG SRL Satu Mare

Scanteiesti

2.5

R535/2009

PIF

 

6

10

SC
EOL Energy Moldova SRL Satu Mare

Varlezi

6

R127/2009

PIF
nr. 807/26.02.2016

 

7

11

SC
EOL Energy Moldova SRL Satu Mare

Smulti

2

R126/2009

PIF

 

8

12

SC
SMARTBREEZE SRL

Apollo
Frumusita

15

R154/2010

3/16/2021

 

9

13

SC
TODAY POWER SRL

Branistea

2

R789/2010

PIF

 

10

14

SC
FUTURE POWER SRL

Pechea

2

R790/2010

PIF

 

11

19

SC
ALIZEU EOLIAN SRL

Baleni

50

R348/2011

PIF

 

12

22

THREE
WINGS SRL

Slobozia
Conachi

2

R265/2012

PIF

 

13

23

SC
ROMSTAL IMEX SRL, Bucuresti

Sat
Costi

0.23

R322/2009

PIF

 

14

30

EWE FRUMUSITA SRL

CEE Frumusita

66

362/2021

12/31/2025

 

15

31

SMART POWER GENERATION ALFA SRL

Cudalbi 2

38.4

18397/2021

5/24/2025

 

16

32

SIX WINGS SRL

CEE Pechea 7,3 MW

7.3

23078/2021

9/12/2025

 

17

34

VECTOR
WIND EXPERT S.R.L.

CEE
VECTOR

24.8

13630/2022

 

 

  

17

Total FDEE Muntenia

312.23

   
  

18

Total general

502.73

   

 

 

T2 Situatia
documentatiilor parcuri eoliene Galati in curs de reglementare

  

 

Nr.   crt

Denumire
investitor

Denumire
centrale electrice eoliene

Puterea
aprobată
(MW)

Data CR

 

Data  PIF

Data
incepere procedura reglementare

1

SMART POWER GENERATION
ALFA SRL

 

Cudalbi 2

38

SPGA 1 Acord de mediu          nr. 03/ 20.08.2021                                 SPGA 2 DEI
452/22.03.2021

 

2

ANHSTALL GREEN ENERGY

 

Scanteiesti

93

Aviz mediu nr. 6/18.05.2023                             

 

3

EE BERESTI WIND SRL

 

Beresti

124

Aviz mediu 8/18.07.2023

 

4

EWE FRUMUSITA SRL

 

Frumusita

68

Analiza RIM Dezbatere

 

5

VECTOR WIND SRL

 

Frumusita

24

Analiza RIM

 

6

HOOPEKS INTERNATIONAL
SRL

 

Galati(Valea Marului)843,2

843

Etapa definitivare RM

 

7

ONE GREED SRL

 

Schela

6,2

DEI 1.118/30.06.2023

 

8

SIX WINGS SRL

 

CEE Pechea 7,3 MW

7

DEI 1.682/08.11.2021

 

9

ECO TULUCESTI SRL

 

Tulucesti

12

Completare memoriu 10.07.2023

 

10

WILDE WIND SRL

 

Slobozia Conachi

50

Completari

 

11

GREEN LABS ADVERTISING
SRL

 

Galati NV

204

Etapa incadrare

 

 

Total  Putere documentaitii in curs de
reglementare

 

 

1463

 

 

 

 

 

 

 

 

 

4. JUdet Braila

 

 

 

 

Situatie racordare SEN
la 30.06.2023

Judet Braila

 

 

 

 

 

 

 Nr.   crt

Nr.   SEN

Denumire
investitor

Denumire
centrale electrice eoliene

Puterea
aprobată
(MW)

Data
CR.

Data  PIF

Act APM

 

1

4

SC
GREEN ENERGY FARM SRL SRL

Cuza
Voda

6

5/28/2010

PIF

  Aut.nr.181/2022

 

3

8

SC
SOFT GROUP SRL

Insuratei

10

9/28/2009

PIF

  Aut.nr.180/2022

 

4

15

WPD
ROMANIA WIND FARM 04 SRL

Baraganu
FOST Victoria

8

12/14/2010

12/14/2021

 

 

5

17

SC
KELAVENT CHARLIE SRL

Dudesti

8

12/14/2010

PIF

  Aut.nr.154/2023

 

6

18

BRAILA
WINDS SRL

Gemenele

47.5

4/1/2011

PIF

  Aut.nr.90/2022